What’s The production process of medical casters?

Hello, come to consult our products !

What’s The production process of medical casters?

1. Design and development: First of all, the design and development of casters need to be carried out according to the needs and specifications of medical equipment. This includes determining requirements for materials, load capacity, dimensions, construction, etc.

2. Material preparation: According to design requirements, select appropriate materials for production. Usually, medical casters will choose materials with wear resistance, certain strength and corrosion resistance, such as polyurethane, rubber or metal.

3. Processing and manufacturing: According to the design drawings, the selected materials are processed and manufactured. These include cutting, welding, heat treatment, machining, painting and other processes to ensure the precision, quality and reliability of the casters.

4. Quality control: Throughout the production process, quality control is required to ensure that the casters meet the requirements of medical equipment. Quality control can include material inspection, process inspection, product testing and other links.

5. Assembly and testing: After the casters are manufactured, they need to be assembled and tested. This includes installing bearings, attaching components such as casters and brackets, and performing load and run tests to ensure caster performance and durability.

6. Packaging and delivery: After the assembly and testing are completed, the casters will be packaged and delivered according to the order requirements. During the packaging process, the casters need to be protected from damage, and the product name, specification, batch number and other information should be marked.

The above is the general production process of medical casters, and the specific process steps may vary due to different manufacturers and product characteristics.